1Start with how you use the room
Write down what works and what does not: where you prep, where things get stored, where people gather. A layout that fixes those problems matters more than any finish.
- Which appliances are staying, and which are moving?
- Do plumbing, gas or electrical lines need to move?
- Is there enough ventilation for the cooking you do?
2The usual order of work
| Step | What happens |
|---|---|
| 1. Plan | Layout, measurements, scope of work, budget and permits. |
| 2. Demolition | Old cabinets, counters and flooring come out. Hidden issues sometimes appear here. |
| 3. Rough-in | Plumbing, electrical and ventilation are placed or moved, then inspected where required. |
| 4. Surfaces | Drywall, paint, flooring and cabinets go in. |
| 5. Counters and fixtures | Counters are measured and installed, then sinks, faucets and appliances. |
| 6. Finish | Backsplash, trim, touch-ups, a walk-through and a punch list. |
3Cabinets, counters and lead times
Cabinets and appliances can take weeks to arrive, and counters are usually measured after cabinets are set. Ask for the schedule in writing, and confirm what happens to the timeline if an item is delayed.
4Living without a kitchen
Plan where meals will come from. A small temporary setup with a sink alternative, a microwave and a cooler can make the weeks easier. Ask how long utilities will be off at each step.
5Questions worth asking
- Who orders materials, and who checks them on arrival?
- What is included for demolition and disposal?
- How are changes written down and priced?
- What warranty applies to the work and to the products?
General information only. Mortelo is not a contractor, remodeler, lender, insurer, or licensed professional, and this is not professional, legal, or financial advice. Codes, prices, and practices vary by location and change; check with a licensed professional and your local building department. Updated October 30, 2026.